Argentina Santa Cruz CC/LB Hydropower Project Department
Date: October 2021
Export country: Argentina
Project Overview: Pull the 90-ton concrete molding machine through the 30° slope with hydraulic jacks
Export Equipment:
1 Steel strand jack 100 tons 2 sets
1.1 Clip
1.2 Hydraulic connectors
2 hydraulic oil pump 7.5kw 2 sets
3 Operation console 1
4 HP laptops
5 17.8mm galvanized steel strand 1620 meters
5 steel strand reels 2
6 150m data cables 2pcs